M4 (Istanbul Metro)

From Wikipedia, the free encyclopedia
Jump to: navigation, search

M4
Overview
Type Rapid Transit
System İstanbul Metro
Status Under Construction
Locale İstanbul, Turkey
Termini Kadıköy
Kaynarca
Stations 19
Services 1
Operation
Opened 2012
Operator(s) İstanbul Ulaşım A.Ş.
Rolling stock 144 CAF [1]
Technical
Line length 26.5 km (16.5 mi)
No. of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in) Standard gauge

M4 is a rapid transit line of the İstanbul Metro, currently under construction in İstanbul, with opening planned to be on 2012. The M4 will be the only rapid transit line on the Asian side of İstanbul. The line starts at Kadıköy, on the seashore close to Haydarpaşa Terminal, continue north parallel with the Haydarpaşa-Gebze commuter line until Ayrılıkçeşme and than goes under the highway D.100. As of 2012, the Kadıköy-Kartal section is almost complete.

Contents

[edit] History

A plan to build a subway line on the Asian side of İstanbul was approved in 2005. Construction started shortly after. In mid-2010, the tunnel building was complete and the track laying started. The route has connections with TCDD's Marmaray system at Ayrılıkçeşme and the İstanbul Metrobus system at Uzunçayır. Scheduled opening date was February 2011 up to Kartal but it postponed due to signalization works. [2]

[edit] Gallery

[edit] References

[edit] See also